01522 904 189 info@ifigroup.co.uk

Glengall Road Phase 1 HRB

Project - Glengall Road Phase 1 HRB — RIBA Stage 3–7 Fire Protection Inspection Management

Accreditations

We provide trusted fire safety expertise supported by recognised training, professional standards and inspection-led knowledge to clients throughout all areas of the UK.

Learn About Us

We are a specialist passive fire inspection company supporting clients with independent, evidence-led inspections for fire doors, fire stopping, cavity barriers, and much more!

Project: Glengall Road Phase 1
Client: Southern Housing
Year: 2025
Building Type: Higher-Risk Residential Building
Service: RIBA Stage 3–7 Passive Fire Protection Inspection Management

Project Overview

IFI was appointed to support Southern Housing on Glengall Road Phase 1, a higher-risk residential building requiring structured fire protection input from design development through to completion, occupation and post-completion remedial support.

Our role covered the overall inspection management process, review and approval of passive fire protection details, inspection of site works and preparation of final sign-off reporting.

IFI also supported the pre-occupation fire risk assessment process and subsequent fire protection remedial works, assisting the client in managing fire safety matters through to close-out.

Scope of Services

IFI’s role included:

  • RIBA Stage 3 design and strategy review support
  • RIBA Stage 4 review of passive fire protection details
  • RIBA Stage 5 site inspection management
  • RIBA Stage 6 completion and final sign-off reporting
  • RIBA Stage 7 post-completion remedial support
  • Review and approval of fire protection details
  • Inspection of fire stopping, compartmentation and fire protection interfaces
  • Fire door and doorset inspection support
  • Pre-occupation fire risk assessment support
  • Remedial works tracking and close-out reporting
  • Review of evidence for project completion and handover

Project Outcome

IFI provided Southern Housing with a structured fire protection inspection and reporting process across RIBA Stages 3–7, supporting design review, construction-phase quality control, completion evidence and post-completion remedial close-out.

UK Regulatory Compliance

Experienced Fire Specialists

Audit-Ready Reports

Trusted By Clients Nationwide